Geolocation error:
Sorting:
Summer Gulf power plant area, Kiinteistö Oy Kaapelitalo. On the left Power Plant or nk. Boiler/turbine hall. On the right two unnecessarily decommissioned gas clocks after the start of the gas distribution. On the left steel structure clock, the cleaning works of contaminated soil are under way. The buildings of the Suvilahti energy production area are designed by Selim a. Lindqvist. navigate_before navigate_next
Approximate address: Suvilahti, 00540 Helsinki, Finland
Nurmi Juho HKM, valokuvaaja
Summer Gulf power plant area, Kiinteistö Oy Kaapelitalo. On the left Power Plant or nk. Boiler/turbine hall. On the right two unnecessarily decommissioned gas clocks after the start of the gas distribution. On the left steel structure clock, the cleaning works of contaminated soil are under way. The buildings of the Suvilahti energy production area are designed by Selim a. Lindqvist.
2013
add_location Add a geotag
add_a_photo Add a rephoto
Annotate
Categorize
Transcribe
Edit picture
photo_album
Helsinki
 account_circle

Finland
 account_circle

Kalasatama
 account_circle

Vilhonvuori
 account_circle

person_pin
local_offer